Case Study

Simmons University

Image
Simmons University

LED Lighting and controls upgrade

Founded in 1899, Simmons is a private university that sits in the heart of Boston, Massachusetts. Featuring a historic campus and 8:1 student/faculty ratio, Simmons delivers a high-quality and boutique experience to its students. This includes close attention to the operations of its buildings as well.

The goal of this design/build project was to decrease energy usage and implement smart control over lighting systems with a modest project payback period and minimal disruption to campus life.

 

The Solution

This turnkey upgrade project started with a no-cost audit to identify energy efficiency opportunities. This resulted in identifying retrofits in two primary buildings on campus. The project featured new lighting, retrofitted lamps, and fixtures with added occupancy controls.

The project was designed to fit staff and student schedules. Our team completed the project using a combination of first, second, and third shifts to finish the job with as minimal disruption as possible. 

  • LED lighting
  • Advanced controls
  • Utility incentive qualification
  • No-cost energy audit

 

The Results

Once complete, kWh usage decreased in these buildings’ lighting systems by 79%. We added or replaced 35% of this project’s fixtures with built-in occupancy sensors. Our team fine-tuned these fixtures to turn off and save additional energy in unoccupied areas. Mantis also improved the pool area with both wattage savings and higher lumen output. The increased lumens resulted in a more inviting and brighter space.

$57,450

TOTAL ANNUAL SAVINGS

$83,670

TOTAL INCENTIVE

306,500

ANNUAL kWh SAVINGS

2.6 years

PROJECT PAYBACK

Ready to Go?

Have Questions? We’re Here to Help!

Discover more about improving facility performance while reducing costs.

Similar Case Studies

Image
parent with child at school
Early Childhood Education Provider

A multi-site early childhood education provider needed a more dependable approach to mechanical system performance across a geographically dispersed portfolio.

Read More
Image
fighter jet and truck on tarmac
PNW Military Installation

A large joint military installation needed a repeatable way to assess and maintain roofs across a vast, security-sensitive portfolio.

Read More
Image
research lab
Federal Biomedical Research Campus

A federal biomedical research organization needed an integrated roofing program to combine condition assessments, preventive maintenance, data support, repair coordination, and rapid leak response across its active research campuses.

Read More