The Challenge

Established in 1957, the University of Hartford (UHart) is a private university of over 6,000 students in West Hartford, Connecticut. Its 350-acre main campus extends into neighboring Hartford and Bloomfield.

UHart has seen significant growth in the last two decades with the addition of its new residence hall, Hawk Hall, and the $34 million Integrated Science, Engineering, and Technology complex.

To keep up with the modern expectations of educational facilities and support its mission to become a future-facing institution, the University of Hartford committed resources to reduce its carbon footprint and encourage green solutions.

This initiative included a campus-wide lighting overhaul project, replacing old incandescent and fluorescent lighting with energy-efficient LED lighting.

UHart’s goals for this project included:

  • Increasing energy savings while lowering the overall operating cost of the University
  • Uncovering and maximizing available utility incentives
  • Improving in-house understanding of new control systems for lighting

Some additional project constraints included:

  • COVID protocols that limited accessibility to facilities at certain times of day
  • A diverse mix of building sizes, types, and age
  • Concerns over performing work on occupied buildings

 

The Solution

To achieve UHart’s goals, old incandescent and fluorescent lighting was replaced with energy-efficient LED lighting across the campus.

The Mantis Team installed occupancy sensors in areas that did not previously have them, significantly reducing light usage when rooms and hallways are empty. Additionally, the automated daylight savings sensors were installed to control the amount of light needed in a room while natural light enters.

Because we installed integrated control systems in conjunction with the LED lighting technology, the University gained granular control of its lighting and customized it to different individual parameters for the occupants of other rooms. (i.e., if one professor likes their classroom brighter or darker.)
 

The Results

  • Reduced its lighting and maintenance costs by nearly $1,000,000 per year
  • Saves over 5,000,000 kWh annually
  • Funded nearly 50% of the project costs through utility incentives
  • Total utility incentive was nearly $2.7 million, resulting in a net cost of $2.9 million and a payback period of roughly 3 years
  • Rooftop unit optimization using sensors to setback units, resulting in units running when needed vs constantly
$950,000

Total Annual Savings

$2,700,000

Total Incentive

5,400,000

Total Annual kWh Saved

3 Years

Project Payback

Ready to Go?

Have Questions? We're Here to Help!

Discover more about improving facility performance while reducing costs.

Similar Projects

Image
roof
Seeing What's Overhead: How Roofing Data Reveals Risk and Opportunity

In most facility portfolios, roofing sits at the top of the deferred maintenance list and sometimes near the bottom of the visibility list. That's a costly combination. Commercial roof replacement isn't cheap. Depending on the system, square footage, an

Read More
Image
municipal building
Four Key Priorities Shaping Public Sector Facility Performance

Public institutions and governments at every level are carrying a growing burden: aging public buildings that cost more every year to maintain, heat, cool, and keep operational. Deferred maintenance is piling up, budgets are tightening, and expectations f

Read More
Image
Worker inspecting HVAC unit
From Plan to Performance: Why Disciplined Delivery Defines HVAC Capital Success

You've done the hard work of understanding your portfolio up to this point. You know which units are aging, which refrigerants are at risk, and which sites deserve priority attention. That's the foundation. But there's a critical gap between insight and o

Read More