Large Cheese Manufacturer

Image
cheese manufacturing facility

Eliminate humidity problems in cold storage facilities that impacted energy performance and food safety

 

The Challenge

The largest private-label cheese manufacturer in the US had problems with humidity management and efficiency at 22 manufacturing locations and distribution centers comprising 3.1M square feet of refrigerated space.

 

The Solution Mix

First, we set a baseline. Then, we determined the true cause of the problems. What initially appeared to be an insulation issue was actually a combination of air infiltration, HVAC negative pressurization, and thermal transmission through the building envelope. Next, we created a roadmap and identified corrective measures. We then developed budgets, return on investment calculations, and project plans. We engaged decision-makers and developed a comprehensive program that includes engineering design, procurement, project management, and commissioning. Finally, we reported progress by tracking outcomes to validate the solutions.

 

The Results

  • A long-term solution to the problem – 20+ year engineered design life
  • Significant energy savings – reduced refrigeration energy load by 20%
  • Food safety issues resolved – no reported violations in over 6 years
  • Increased operational efficiency – significant reduction in maintenance and repair for both refrigeration equipment and roof leak response
20+

YEARS OF ENGINEERED DESIGN LIFE

20%

REDUCED REFRIGERATION ENERGY LOAD

6+

YEARS OF NO REPORTED VIOLATIONS

Ready to Go?

Have Questions? We’re Here to Help!

Discover more about improving facility performance while reducing costs.

Similar Case Studies

Image
parent with child at school
Early Childhood Education Provider

A multi-site early childhood education provider needed a more dependable approach to mechanical system performance across a geographically dispersed portfolio.

Read More
Image
fighter jet and truck on tarmac
PNW Military Installation

A large joint military installation needed a repeatable way to assess and maintain roofs across a vast, security-sensitive portfolio.

Read More
Image
research lab
Federal Biomedical Research Campus

A federal biomedical research organization needed an integrated roofing program to combine condition assessments, preventive maintenance, data support, repair coordination, and rapid leak response across its active research campuses.

Read More